Overview

Field Survey:

  • Conducted a comprehensive field survey of existing equipment and facility loads.
  • Provided an accurate summation to the customer.
  • Recorded all survey information accurately with data entry.
  • Delivered both digital and paper copies of the survey information to the customer.

Installation:

  • Installed bus plugs to a busway in correlation with existing equipment.
  • Installed conduit and wire from bus plug to equipment or facility load.
  • Performed testing on cables, bus plugs, and busway.

Power Connection:

Installed new power connections to all equipment and facility loads according to customer specifications.

Safety, Schedule, and Budget:

Prioritized safety, schedule, and budget throughout the project.

Client

General Motors

Location(s)

  • Wyoming, MI, USA

Subsidiaries/Partners

Date Completed

June 2025

Value

$2,847,356

Services

  • Service Electrical & Motor Control Troubleshooting

Markets

back to top