Overview

Technology for the Future

Virtual Design Construction (VDC) and Advanced Construction Planner (ACP). Our VDC team leverages BIM to review, share and optimize plans early, working together with our ACP, site engineers and site leadership. Together we design efficient installation, coordinating prefabrication opportunities to benefit all trades. Shop drawings, support installations, and material tracking are modeled in 3D to streamline filed work, reduce rework, and improve safety. Templated assemblies are cataloged for future use, maximizing efficiency and savings. From planning through completion, this collaborative approach ensures smarter construction, faster schedules, reduced labor, and successful project delivery for every team involved.  

Service Benefits

Maximizing Project Efficiency with BIM Modeling Benefits

Transform Project Delivery with Advanced BIM Modeling Solutions

Collaborative 3D modeling enables early-stage coordination, increasing build accuracy and reducing change orders and rework. 

Achieve Greater Efficiency with Streamlined Processes and Workflows

BIM drives smarter workflows by aligning trades, identifying prefabrication opportunities, and streamlining installation logistics

Realize Cost Savings with Accurate Project Estimates and Resource Management

Our VDC team reduces labor and material waste, helping you finish on time and under budget. 

Software

Software That Supports Every Step

Our software tools enable precise planning, real-time collaboration, and clear project visualization throughout every phase of construction.

Revizto

EVOLVE

Trimble

Autodesk Revit Logo

Autodesk Revit

Autodesk Navisworks

Autodesk BIM 360

Implementation Method

Implementation for Seamless BIM Integration

Our BIM implementation method ensures smooth collaboration, accurate modeling, and effective coordination from project start to finish, optimizing workflows and driving cost savings. We integrate all stakeholders early to streamline processes, minimize errors, and enhance project delivery efficiency.

1

Design Phase: Conceptualizing and Strategizing for Success

Program, conceptualize, and analyze designs to create a clear and efficient roadmap for the project.

2

Build Phase: Constructing with Precision and Collaboration

Document, collaborate, and fabricate to bring designs to life, ensuring accurate and timely construction.

3

Maintain Phase: Ensuring Longevity Through Expert Maintenance

Deliver, operate, and maintain the project while renovating to keep everything running smoothly over time.

Learn More About Our BIM Capabilities!

Reach out now to see how BIM Modeling can save time, reduce costs, and improve quality.

back to top