Field Verification:
Verified all existing loads.
Demolition:
Demolished existing panels, transformers, and any conduits not being utilized.
Installation:
Compliance:
Ensured that the installation of all equipment meets all code compliance.
Safety, Schedule, and Budget:
Emphasized safety, schedule, and budget throughout the project.
General Motors
June 2025
$973,164