The Detroit Assembly Plant – Mack project encompassed a 2.5 million square-foot manufacturing plant. Motor City Electric Technologies was responsible for the access control and security systems at this new assembly site. Over the course of the project, MCET installed 200 cameras, 30 intercoms, 33 access control panels, and one security head-end command center. In total, MCET installed 47,000 feet of copper cable and 71,977 feet of fiber optic cable at the Detroit Assembly Plant – Mack.
Stellantis